Ramesh Kumar

Ramesh Kumar

+•• ••••• •••••••••••@•••••.com

Sr Engineering Manager- Renewable · CR3 · 16.5 yrs

As a Senior Engineering Manager in the renewable sector, I approach my work with a deep sense of accountability and meticulous diligence, ensuring every project meets the highest standards. I am passionate about fostering collaborative environments where teams can pursue mastery, driving innovative and sustainable solutions.

  • Mumbai
  • Open to Mumbai
  • On-site, Hybrid
  • In 90 days

Ask about Ramesh

Skills

Showcased in Proof-of-Work

View Proof-of-Work
Circuit AnalysisCooling System OptimizationCross-Departmental CoordinationCivil Engineering CalculationsFoundation DesignReliability ImprovementEngineering CalculationsBattery Charging Systems

Claimed

Substation DesignTechnical TroubleshootingTechnical UnderstandingProblem SolvingMeeting FacilitationFostering Team MotivationCustomer Issue ResolutionOn-time DeliveryStakeholder Communication AdaptationTask SchedulingNew Technology IntegrationCost-Saving Initiative Management

Proof of Experience

CR3

Sr Engineering Manager- Renewable

CR3 · Oct 2025 – Present

Sr. Design Manager (Solar)

CR3 India Pvt Ltd · Sep 2025 – Present

  • Conduct Feasibility study of C&I and Utility scale of solar project.
  • Responsible for the System Design, verification and approval of Solar PV plant DC System and AC System (LV, MV and HV).
  • Review and preparation technical data sheets for BOP components of Solar plant and Sub-station equipment.
  • Review and develop the Module layout, Equipment layout and SLDs, String Calculation, Cables selection, Earthing Design, Switchgear Selection, SCB, Panels, PCU, Transformer etc.
  • Review, evaluate, and approve vendor technical documents ensuring compliance with project and industry standards.
  • Ensure design and documentation compliance with relevant standards such as IEC, IEEE, IS, and SEC.
  • Perform PVsyst simulations and analyse energy yield, performance ratio and system behaviour.
  • Lead engineering teams with responsibility for work planning, scheduling, resource allocation, decision-making, and coordination with internal/external stakeholders.

Renewable Expert

Bureau Veritas Pvt Ltd · Apr 2024 – Sep 2025

  • 1.5 GW owner's engineering solar IPP project with ACWA power, SAUDI ARABIA.
  • 400 MW ongoing owner's engineering solar IPP project with Tabarzal, SAUDI ARABIA.
  • 300 MW ongoing owner's engineering solar IPP project with PURVA Green Energy, Rajasthan.
  • Sub-Station design reviews up to 220 kV, MV and HV equipment size, design and calculation verification, Power system Analysis, CRS comment, Owner's Engineering.
  • Knowledge of standard like IES, IEEE, SEC, SAGC, IS.
  • Conducting Performance Assessment and Testing of the Solar PV Projects.
  • PV system sizing, and design Review pertaining to DC and AC side.
Bureau Veritas Group

Renewable Expert (South Asia Region)

Bureau Veritas Group · Apr 2024 – Sep 2025

  • Renewable Energy- Solar and Wind, Owner's Engineering, LIE, Hybrid System(BESS+Solar), Electrical Design Engineering, Substation Designing up to 220kV voltage profile.

Design Manager

Husk Power Systems · Feb 2024 – Apr 2024

Associate Manager

Ellume Solar Pvt Ltd · Feb 2020 – Feb 2024

  • Design and Engineering of the Solar PV plant (DC and AC) system.
  • Working on PVsyst software and simulate the energy yield and performance ratio and analysing the shadow effect on Google Sketchup and Skelion software.
  • ROI (Return of Investment) calculation, BOQ (Bill of Quantity) preparation, Details project Report, Defined the Scope of work, Review and preparation of General Technical Parameters, Check list, Project costing and estimation.
  • Design and Engineering of DC and AC designing- PV Module Selection, Inverters (String and Central) selection, Solar Structures, String sizing, DCDB/SCB/SMB, PV Array Layouts, Power cable (DC/AC) sizing calculation, Cable Routing and length estimation, ACDB, LT, HT, RMU, CRP panel selection and testing, HT Switch-gear selection (Power/Auxiliary Transformer, Breakers, CT, CVT, PT, Metering, Earthing System, Lightning Arrestor) and testing, WMS system, Transmission line work, Battery/UPS sizing.
  • Power system sturdy- Load flow analysis, Motor starting Analysis, Relay coordination, short circuit analysis performing on ETAP Software.
  • Technical support in commissioning and execution of Solar system (Execution experience 1.2 MW system with Power evacuation 33 kV and PSS up to 220 kV).
  • Equipment inspection, Quality control, assurance and documentation & Test report review.
Ellume Solar Pvt. Ltd.

Associate Manager

Ellume Solar Pvt. Ltd. · Feb 2020 – Feb 2024

SAKA Engineering Systems Pvt Ltd

Sr. Electrical engineer

SAKA Engineering Systems Pvt Ltd · Mar 2014 – Feb 2020

  • Sr.
  • Project engineer

Senior Engineer

SAKA ENGINEERING SYSTEM (P) LTD. · Mar 2014 – Feb 2020

  • Erection and commissioning all drying system, HAG, Burner, conveying system, Blending system, Silo system.
  • Testing and commissioning of all Individual Equipment's in indoors and outdoors yards of power control centre and motor control centre.
  • Pre commissioning equipment test like FAT and SAT.
  • Commissioning, Troubleshooting and maintenance of different type of Industrial motor, MCC and PCC panel.
  • Executing the schematic diagrams as build modification & interlock diagram as per site requirement.
  • Preparation, planning and review of SLD and schematic diagrams also prepare it's related documents like load list.
  • Selection/sizing of HT and LT cables, Cable Lay-Out, Cable Tray.
  • Selection, Installation and calibration of Instrument and Sensor like VFD, Pressure Transmitter, DPT, Manometer, Pressure Gauge, Actuated Valve, Flow Transmitter, Air Ingress Valve, Thermo-couple, RTD etc.
  • No Load & Load run trials of motors.
Suzlon Wind Energy Corporation (SWECO)

Electrical Engineering

Suzlon Wind Energy Corporation (SWECO) · May 2010 – Mar 2014

  • ENGINEER (Operation & Maintenance)

Operation Engineer

Suzlon Energy Limited · May 2010 – Feb 2014

  • Commissioning and testing of WTG's audits components.
  • Fault Analysing, Trouble Shooting and Modifications of WTG's Control System.
  • Designing training modules and calendar for newly joined O&M team to build capability towards first level problem solving.
  • Ensuring maximum uptime and machine availability to customer by eliminating repeated errors.
  • Analyses of Daily generation report, non-conformity report, break down report etc.
  • Monitoring the status wind turbines through CMS (Central Monitoring Station) for real time communication with control system.
  • Planning for preventive & predictive maintenance of machinery ensuring maximum machine uptime.
  • Involved in the commissioning of equipment and providing technical support during any fault/malfunctioning.
  • Troubleshooting for problem in WTG.
  • Commissioning Programming and Troubleshooting of Servo converter system (LUST Drive).
  • Maintain logbook of daily operations details.

Proof-of-Work

Vinmart Group

SmartPole 2.0Completed

Vinmart Group · Engineering Design & Detailed CalculaTIons (Solar PV & BESS)

Vinmart Group keeps this one

Observed work session · requested 3 Aug 2026 · completed 15 Aug

What they built

The candidate relied heavily on ChatGPT to perform the core engineering analysis and calculations required by the assignment.

How they worked

Started with Task Review and Brief Analysis, moved through AI-Generated Engineering Assessment, Cross-Referencing Brief and AI Output, and finished on Deliverable Preparation.

Showcased in this Proof-of-Work

Circuit AnalysisCooling System OptimizationCross-Departmental CoordinationCivil Engineering CalculationsFoundation DesignReliability ImprovementEngineering CalculationsBattery Charging Systems

Proof of Education

Master of Technology, Energy Management

SEES, DAVV, Madhya Pradesh · 2024 — 2026

Bachelor of Technology, Electrical Engineering

DRIEMS, BPUT, ORISSA · 2005 — 2009

A Proof CV — one profile, kept current, with the proof attached. Back to the portal